Project support

Project support from survey to as-built.

We turn the site survey into an optical/power budget, a bill of materials, a pilot, a documentation pack and a staged delivery plan. The local contractor installs; we support the chain.

Phases
5
Pilot
1 site
Docs
Per model
Delivery
Staged

Project path

05
  1. 01

    Site data sheet

  2. 02

    Optical and power budget

  3. 03

    Bill of materials

  4. 04

    Pilot / FAT

  5. 05

    Delivery and as-built

Installation, trenching and splicing stay with the local contractor. The detailed phase outputs are below.

What project support is

Four deliverables before and after the shipment.

For integrators, contractors and project owners: the engineering and documentation support that turns a site survey into a buildable, testable and handover-ready package. This is not a case-study page and not an installation service.

Design support

Endpoint list, route length, mains and load become a split ratio, an optical budget and a PoE/PoF load calculation.

BOM and quotation

OLT/ONU, splitter, PoE/PoF, cable, ODF and spares, with the assumptions behind each line.

Pilot / FAT

One site or one batch configured on the actual headend, tested and recorded before the rollout.

Documentation and delivery

Datasheets, test data, packing list, HS code, as-built labels and a staged shipment plan.

Installation, trenching, splicing and ISP operations stay with the local contractor. The scope boundary is set out below.

Start here

Six answers are enough to start.

You do not need a finished design or a full bill of materials. Send these six inputs and we will return the missing questions, the first budget and a pilot scope.

Send the six inputs

Send the data through the contact form or WhatsApp. Drawings are welcome but not required to start.

01

Endpoint count

Cameras, APs, rooms, readers or meters.

02

Longest run

From the nearest powered cabinet to the farthest endpoint.

03

Mains at the endpoint

Yes or no; if no, the distance to the nearest board.

04

Load per device

Nominal and peak watts, including IR, heater or PoE class.

05

Country and destination

For plug, voltage, HS code and the document set.

06

Services involved

CCTV, Wi-Fi, FTTH, CATV, access control or a mix.

Lifecycle

Five phases, five deliverables.

Each phase produces a document the next phase can use. That is what keeps a multi-site rollout from turning into a series of site visits.

Network equipment being tested in a lab rack
01

Site data sheet

Endpoint list, distance, mains, load, country. Output: a design input table.

02

Optical and power budget

Split ratio, fibre/connector/splice loss, 3 dB margin, PoE/PoF load. Output: the calculation.

03

Bill of materials

OLT/ONU, splitter, PoE/PoF, cable, ODF, spares. Output: a quote with assumptions.

04

Pilot / FAT

One site or one batch configured and tested on the actual headend. Output: a test record and a go/no-go.

05

Delivery and as-built

Staged shipment, datasheets, test data, packing list, HS code, port/connector labels. Output: the handover pack.

Pilot programme

Prove one site before the rollout.

A pilot is the cheapest way to find a mismatch in the OLT profile, the ONT firmware, the splitter polish or the switch budget. It is also the fastest way to get the installer comfortable with the chain.

One building or one gate

A small, representative slice of the real project — not a bench demo.

Configured for the site

The OLT/ONU or switch/PoF pair is configured with the actual VLAN, split and connector plan.

Test record

Optical power, PoE/PoF load and registration are recorded and compared with the design.

Deployment & commissioning

What the installer needs to get right.

A pilot proves the design; the installation decides whether it survives. These are the checks that most often change the handover record.

ODF and cable

12/24/96-port ODF, SC/UPC or SC/APC adapters, patch cords, trays and bend radius. Label both ends before the cable is pulled.

Fibre into the room

Use conduit or a dedicated route, keep the bend radius, leave a service loop and terminate in a wall box or ONT tray.

ONU placement

Ventilation, mounting height, adapter clearance, fibre tray and a label the next technician can read. Avoid heat sources and tight cabinets.

Grounding and surge

Bond the enclosure, protect the 48 V pair at the entry and use the specified SPD. A missing protective earth is a common installation error.

Optical loss and test

Measure connector, splice and splitter loss, compare with the budget and record the result per port. Clean before you measure.

Cabinet wiring and handover

Use the small or large-scenario wiring diagram, label ports, record the as-built and hand over the cloud/project-sharing access.

If you want this checklist applied to a specific site, send the drawings and the device list; we will mark the missing inputs.

Discuss a project

Documentation pack

What the handover includes.

DocumentPurposeWhen
Model datasheetPorts, optics, power, temperature, managementWith the quote
Optical / power budgetWorst-case margin and load assumptionsWith the quote
Splitter test dataInsertion loss and return loss per batchWith the shipment
Packing listQuantities, weights, dimensionsWith the shipment
HS code + IncotermCustoms and freight basisWith the invoice
As-built label planPort, device and connector mappingBefore dispatch

Scope boundary

What we do not do

  • Cable trenching, ducting or pole foundations
  • Fusion splicing and on-site termination
  • Installation labour and civil works
  • ISP licensing or broadband operations

These are carried out by the local contractor. We supply the design, equipment and documentation, and support the commissioning remotely.

A note on references

Project names and photos are shared only with customer permission. We do not publish invented cases or stock photos labelled as our projects. For a tender, tell us the market and the project type and we will confirm what can be released.

Project FAQ

Project questions before the order.

If your question is not here, send the site details and we will answer with the calculation, not a brochure.

Ask an engineer

Can I see a case study for my market?

We publish project references only with the customer’s permission. Tell us the market, the project type and the scale; if there is a relevant reference we can share, we will send it under the agreed terms. We do not publish invented client names or stock photos labelled as our projects.

What does a pilot include?

A pilot is one building, one floor or one gate: a small set of OLT/ONU or switch/PoF units configured for the actual site, tested against the design and documented. It validates the optical budget, the management profile and the installation before the full order.

Who does the installation?

The local contractor or integrator. We supply the design, the equipment and the documentation; we do not provide splicing, trenching or on-site installation. Remote design support is available during commissioning.

What documentation comes with a project order?

Model datasheets, splitter batch test data, the optical/power budget, packing list, HS code, Incoterm and the as-built port/connector plan. The exact document set is stated on the quotation.

Can you ship in phases?

Yes. A project can be staged by building, floor or area so the first phase is live before the full rollout. The staging plan and the shipping terms are agreed before the order.

Do you provide training?

A commissioning note and a remote walkthrough are included for the integrator’s team. Formal on-site training is quoted separately and depends on the destination.

Is project support included in the quotation?

The site data review, optical/power budget, BOM and documentation pack are part of the quotation. A pilot/FAT, formal training and remote commissioning support are scoped separately and stated on the quotation.

Next step

Start with one site, not the whole rollout.

Send the site data and we will propose a pilot scope, a design record and a staged delivery plan.

No obligation. The plan states its assumptions so your engineer can check it.