Market guide · Southeast Asia

PON and PoF supply for Philippines

Philippine projects are often island-separated, typhoon-exposed and built around 220 V 60 Hz power. Planning data points to clear GPON ONT and OLT demand; the design work is in split ratios, surge protection and power at endpoints with no mains.

Updated October 24, 2026

Region
Southeast Asia
Configuration
PON + PoE/PoF
Docs
Quote + HS
Design
Budget-first
Smart building at night with connected building systems

Site conditions

What changes the design here.

These are planning conditions, not market statistics. They change the power path, the surge protection, the cabinet cooling and the spares plan.

Grid stability
Variable; backup power and UPS are common at commercial sites
Typhoon and lightning
Wind, rain and surge exposure shape enclosure and cable routes
Island logistics
Sites may need air and sea freight; spares planning matters
Heat and humidity
High year-round; specify ventilated, corrosion-aware enclosures
Site power
220 V AC, 60 Hz common; check older sites for 110 V circuits
New estates
Condominiums and subdivisions are fitted out by developers
Hospitality
Resorts and hotels need data, voice and TV on one fibre

The Philippines is an island market with a construction pattern to match: condominiums, subdivisions, resorts and campus-style developments, each with its own access and security scope. Planning data shows clear search demand for GPON ONT and ONU terms, which fits a market where the subscriber unit is often installed as part of a building fit-out.

The engineering conditions are demanding. Typhoons and thunderstorms make surge and wind loading part of the design, not an afterthought. Heat and humidity age outdoor enclosures quickly, and a site can be a short drive away or a flight and a ferry away, which changes how spares and commissioning are planned.

Power is the detail that catches imported equipment: the common supply is 220 V at 60 Hz, not the 50 Hz used in most of the region. The quotation should state the input range and plug, and older sites should be checked for 110 V circuits. For the network, a fibre backbone with PoE at the cabinet and PoF at no-mains endpoints keeps distance and surge exposure under control.

Import note

HS classification, duty, VAT/GST and type approval are confirmed by the importer’s licensed broker and the destination regulator. The quotation states the Incoterm and the document set; it does not replace a customs ruling.

What buyers usually plan

Philippines: the common project types.

01

FTTH for condominiums and subdivisions

A GPON OLT with 1:32 or 1:64 splitters, a bridge ONT for basic units and a Wi-Fi 6 ONT for premium units. One ONT family across the development reduces firmware and spare-part variety.

02

CCTV and perimeter

PoE switches cover cameras inside the 100 m copper limit. For gates, poles and long perimeter runs, use fibre to a local cabinet or a PoF drop where the load stays under 12 W.

03

Resorts and hotels

One fibre to the room can carry data, voice and 1550 nm CATV. Separate VLANs for guest, staff and payment traffic, plus an ONT with a CATV port, cover most refurbishments.

04

Campus and office

A PON backbone between buildings, a 24- or 48-port PoE switch in each building, and 10G uplinks where CCTV and tenant data share the core.

05

No-mains endpoints

PoF suits gate readers, intercoms, ceiling APs and pole cameras under 12 W within 200 m of a splitter. The splitter and its 48 V supply stay indoors on a UPS.

Starting configuration

01XPON ONT with four GE ports, Wi-Fi 6 antennas and USB

PON access · ONU / ONT

GPON / XPON ONU & ONT

From a 1-GE bridge to a 4-GE Wi-Fi 6 gateway.

XPON ONU and ONT options for FTTH, hotel rooms, offices and outdoor cabinets: 1, 2 or 4 GE ports, Wi-Fi 4/5/6, CATV and POTS options, and 10G PON models. All units are SC single-mode, 20 km, EPON/GPON dual-mode where the model supports it.

PON
XPON, EPON/GPON
User ports
1 – 4 × GE
Wi-Fi
Wi-Fi 4 / 5 / 6
Reach
20 km

Best for FTTH Access Network · Campus Fibre Network · Outdoor Wireless Coverage

View specifications
02GPON OLT with multiple PON ports and SFP uplinks

PON access · OLT

GPON OLT

From a 1-PON gateway to a 112-PON headend.

GPON OLT platforms for FTTH, campus and hotel access: 2.5 Gbps downstream and 1.25 Gbps upstream, 1:64 split per PON port and 20 km reach on Class B+ optics. Configurations run from a compact 1-PON gateway with built-in AC to a chassis with up to 112 PON ports.

Line rate
2.5 Gbps ↓ / 1.25 Gbps ↑
Max split
1:64 per PON port
Reach
20 km, Class B+
PON ports
1 – 112

Best for FTTH Access Network · Campus Fibre Network · Outdoor Wireless Coverage

View specifications
03Stack of managed PoE switches with RJ45 and SFP+ uplinks

PoE switching · managed & unmanaged

PoE Switches

8 to 48 PoE ports, with 10G and 100G uplinks.

PoE switch families from compact 4–8 port units to 48-port Layer 3 switches with 100G uplinks. IEEE 802.3af/at power, VLAN and IGMP isolation, and a 100 m copper limit that decides where the fibre has to take over.

Ports
4 – 48 × GE PoE
Uplinks
GE / 10G / 100G
Power
802.3af / at
Distance
100 m copper

Best for CCTV & Surveillance Power · Parking Lot Camera System · Perimeter Security Power

View specifications
0424-port PoE switch with SFP+ uplinks

PoE switching · 24 port

24-Port PoE Switch

24 PoE ports and four 10G uplinks in 1U.

A 1U Layer 2/Layer 3 PoE switch with 24 GE PoE access ports and four 10GE/GE SFP+ uplinks. It is the standard choice for a CCTV floor, a wireless floor or a building distribution cabinet.

Access ports
24 × GE PoE
Uplinks
4 × 10GE SFP+
Management
L2 / L3
Form factor
1U rack

Best for CCTV & Surveillance Power · Campus Fibre Network · Outdoor Wireless Coverage

View specifications
05PoF power splitter with eight optical power outputs

Power over Fiber · access

PoF Switch & PoF ONU

One hybrid cable to the ceiling: data and 12 W.

A Power-over-Fiber access set: an optical gateway, an 8-output PoF power splitter, hybrid PoF cable and a ceiling Wi-Fi 6 ONU. Each output delivers up to 12 W to 200 m, so ceiling APs and cameras run without a local mains socket.

Power per port
Up to 12 W
Reach
Up to 200 m
Outputs
8 + 1 cascade
Wi-Fi
Wi-Fi 6 AX3000

Best for Outdoor Wireless Coverage · Campus Fibre Network · Parking Lot Camera System

View specifications
06Hybrid PoF cable with two SC/UPC connectors

Power over Fiber · cable

Hybrid PoF Cable

G.657A2 fibre and copper in one flat jacket.

A flat hybrid cable with one G.657A2 fibre and a copper pair, terminated SC/UPC and supplied in 3, 20 or 50 m lengths. Attenuation is ≤0.4 dB/km at 1310 nm and ≤0.3 dB/km at 1550 nm; the jacket is rated −20 to +80 °C.

Fibre
G.657A2, single core
Attenuation
≤0.4 / ≤0.3 dB/km
Lengths
3 / 20 / 50 m
Temperature
−20 to +80 °C

Best for Outdoor Wireless Coverage · Parking Lot Camera System · Bollard & Access Control Power

View specifications

Procurement

What the quotation should state.

Use this as a checklist for any supplier, including us. A quote that omits these lines is not a project quote.

TopicWhat the quotation should stateWhy
HS codeCode per line; network equipment is commonly 8517.62, cable and accessories may differ. The broker confirms.A wrong code delays clearance and changes the landed cost.
IncotermThe term and named place, plus who arranges freight, insurance and import clearance.It fixes where cost and risk transfer.
Voltage and plugInput range, voltage, frequency, and the plug or terminal supplied; confirm 220 V 60 Hz and any 110 V circuit.The wrong adapter or plug stops commissioning.
DocumentationInvoice, packing list, transport document, certificate of origin, datasheet, test reports and conformity certificate.Customs and the project owner need matching documents.
Certification and type approvalApprovals the offered model carries, and whether NTC type approval applies. The importer confirms the scope.Unapproved equipment can be held at import.
PaymentCurrency, method, milestones, bank charges, letter-of-credit acceptance and offer validity.Terms change the cash cost and the risk on both sides.
Warranty and sparesWarranty period and coverage, RMA route, recommended spare list and firmware support.Recovery depends on the spare in the store.

Rates, duty, tax and terms are confirmed at quotation for the selected models and destination. The table is a checklist, not a tariff or price list.

Market FAQ

Philippines: questions before the order.

If your question is not here, send the site details and we will answer with the calculation, not a brochure.

Ask an engineer

Which OLT should a developer specify?

Start from the unit count and split plan. A 1-PON gateway suits a small building; an 8- or 16-PON OLT suits a subdivision or campus. Use 1:32 for long routes and 1:64 for short in-building ODNs.

Is 60 Hz a problem for the equipment?

Check that the OLT and switch supplies are rated for 50/60 Hz, and that the adapter and plug match the site. Confirm the input range and outlet type, and check older buildings for 110 V circuits.

How do we protect outdoor cameras from typhoons?

Use IP-rated, wind-rated enclosures and brackets, keep the fibre backbone optical, keep copper drops short, and fit surge protection at the cabinet and pole. Bond the enclosure to earth.

PoE or PoF for a gate camera?

PoE if a powered switch is within 100 m. PoF if the camera is under 12 W and within 200 m of a splitter, with no mains at the gate. A PTZ with a heater needs a local cabinet and a larger supply.

Can one fibre carry data and CATV?

Yes. A 1550 nm transmitter and EDFA overlay CATV on the same ODN with a WDM coupler; the ONT needs a 1550 nm CATV port and the budget must include the coupler loss.

What should the quotation show for customs?

The code per line, commonly 8517.62 for network equipment, with cable shown separately. Include the Incoterm, packing list, certificate of origin and any NTC approval documents the importer requires.

Next step

Planning a project in Philippines?

Send the destination port, the endpoint count, the longest run and the mains condition. We return the configuration, the document set and the quotation assumptions.

No obligation. The plan states its assumptions so your engineer can check it.