Market guide · Southeast Asia
PON and PoF supply for Philippines
Philippine projects are often island-separated, typhoon-exposed and built around 220 V 60 Hz power. Planning data points to clear GPON ONT and OLT demand; the design work is in split ratios, surge protection and power at endpoints with no mains.
Updated October 24, 2026
- Region
- Southeast Asia
- Configuration
- PON + PoE/PoF
- Docs
- Quote + HS
- Design
- Budget-first

Site conditions
What changes the design here.
These are planning conditions, not market statistics. They change the power path, the surge protection, the cabinet cooling and the spares plan.
- Grid stability
- Variable; backup power and UPS are common at commercial sites
- Typhoon and lightning
- Wind, rain and surge exposure shape enclosure and cable routes
- Island logistics
- Sites may need air and sea freight; spares planning matters
- Heat and humidity
- High year-round; specify ventilated, corrosion-aware enclosures
- Site power
- 220 V AC, 60 Hz common; check older sites for 110 V circuits
- New estates
- Condominiums and subdivisions are fitted out by developers
- Hospitality
- Resorts and hotels need data, voice and TV on one fibre
The Philippines is an island market with a construction pattern to match: condominiums, subdivisions, resorts and campus-style developments, each with its own access and security scope. Planning data shows clear search demand for GPON ONT and ONU terms, which fits a market where the subscriber unit is often installed as part of a building fit-out.
The engineering conditions are demanding. Typhoons and thunderstorms make surge and wind loading part of the design, not an afterthought. Heat and humidity age outdoor enclosures quickly, and a site can be a short drive away or a flight and a ferry away, which changes how spares and commissioning are planned.
Power is the detail that catches imported equipment: the common supply is 220 V at 60 Hz, not the 50 Hz used in most of the region. The quotation should state the input range and plug, and older sites should be checked for 110 V circuits. For the network, a fibre backbone with PoE at the cabinet and PoF at no-mains endpoints keeps distance and surge exposure under control.
Import note
HS classification, duty, VAT/GST and type approval are confirmed by the importer’s licensed broker and the destination regulator. The quotation states the Incoterm and the document set; it does not replace a customs ruling.
What buyers usually plan
Philippines: the common project types.
FTTH for condominiums and subdivisions
A GPON OLT with 1:32 or 1:64 splitters, a bridge ONT for basic units and a Wi-Fi 6 ONT for premium units. One ONT family across the development reduces firmware and spare-part variety.
CCTV and perimeter
PoE switches cover cameras inside the 100 m copper limit. For gates, poles and long perimeter runs, use fibre to a local cabinet or a PoF drop where the load stays under 12 W.
Resorts and hotels
One fibre to the room can carry data, voice and 1550 nm CATV. Separate VLANs for guest, staff and payment traffic, plus an ONT with a CATV port, cover most refurbishments.
Campus and office
A PON backbone between buildings, a 24- or 48-port PoE switch in each building, and 10G uplinks where CCTV and tenant data share the core.
No-mains endpoints
PoF suits gate readers, intercoms, ceiling APs and pole cameras under 12 W within 200 m of a splitter. The splitter and its 48 V supply stay indoors on a UPS.
Starting configuration

PON access · ONU / ONT
GPON / XPON ONU & ONT
From a 1-GE bridge to a 4-GE Wi-Fi 6 gateway.
XPON ONU and ONT options for FTTH, hotel rooms, offices and outdoor cabinets: 1, 2 or 4 GE ports, Wi-Fi 4/5/6, CATV and POTS options, and 10G PON models. All units are SC single-mode, 20 km, EPON/GPON dual-mode where the model supports it.
- PON
- XPON, EPON/GPON
- User ports
- 1 – 4 × GE
- Wi-Fi
- Wi-Fi 4 / 5 / 6
- Reach
- 20 km
Best for FTTH Access Network · Campus Fibre Network · Outdoor Wireless Coverage
View specifications
PON access · OLT
GPON OLT
From a 1-PON gateway to a 112-PON headend.
GPON OLT platforms for FTTH, campus and hotel access: 2.5 Gbps downstream and 1.25 Gbps upstream, 1:64 split per PON port and 20 km reach on Class B+ optics. Configurations run from a compact 1-PON gateway with built-in AC to a chassis with up to 112 PON ports.
- Line rate
- 2.5 Gbps ↓ / 1.25 Gbps ↑
- Max split
- 1:64 per PON port
- Reach
- 20 km, Class B+
- PON ports
- 1 – 112
Best for FTTH Access Network · Campus Fibre Network · Outdoor Wireless Coverage
View specifications
PoE switching · managed & unmanaged
PoE Switches
8 to 48 PoE ports, with 10G and 100G uplinks.
PoE switch families from compact 4–8 port units to 48-port Layer 3 switches with 100G uplinks. IEEE 802.3af/at power, VLAN and IGMP isolation, and a 100 m copper limit that decides where the fibre has to take over.
- Ports
- 4 – 48 × GE PoE
- Uplinks
- GE / 10G / 100G
- Power
- 802.3af / at
- Distance
- 100 m copper
Best for CCTV & Surveillance Power · Parking Lot Camera System · Perimeter Security Power
View specifications
PoE switching · 24 port
24-Port PoE Switch
24 PoE ports and four 10G uplinks in 1U.
A 1U Layer 2/Layer 3 PoE switch with 24 GE PoE access ports and four 10GE/GE SFP+ uplinks. It is the standard choice for a CCTV floor, a wireless floor or a building distribution cabinet.
- Access ports
- 24 × GE PoE
- Uplinks
- 4 × 10GE SFP+
- Management
- L2 / L3
- Form factor
- 1U rack
Best for CCTV & Surveillance Power · Campus Fibre Network · Outdoor Wireless Coverage
View specifications
Power over Fiber · access
PoF Switch & PoF ONU
One hybrid cable to the ceiling: data and 12 W.
A Power-over-Fiber access set: an optical gateway, an 8-output PoF power splitter, hybrid PoF cable and a ceiling Wi-Fi 6 ONU. Each output delivers up to 12 W to 200 m, so ceiling APs and cameras run without a local mains socket.
- Power per port
- Up to 12 W
- Reach
- Up to 200 m
- Outputs
- 8 + 1 cascade
- Wi-Fi
- Wi-Fi 6 AX3000
Best for Outdoor Wireless Coverage · Campus Fibre Network · Parking Lot Camera System
View specifications
Power over Fiber · cable
Hybrid PoF Cable
G.657A2 fibre and copper in one flat jacket.
A flat hybrid cable with one G.657A2 fibre and a copper pair, terminated SC/UPC and supplied in 3, 20 or 50 m lengths. Attenuation is ≤0.4 dB/km at 1310 nm and ≤0.3 dB/km at 1550 nm; the jacket is rated −20 to +80 °C.
- Fibre
- G.657A2, single core
- Attenuation
- ≤0.4 / ≤0.3 dB/km
- Lengths
- 3 / 20 / 50 m
- Temperature
- −20 to +80 °C
Best for Outdoor Wireless Coverage · Parking Lot Camera System · Bollard & Access Control Power
View specificationsProcurement
What the quotation should state.
Use this as a checklist for any supplier, including us. A quote that omits these lines is not a project quote.
| Topic | What the quotation should state | Why |
|---|---|---|
| HS code | Code per line; network equipment is commonly 8517.62, cable and accessories may differ. The broker confirms. | A wrong code delays clearance and changes the landed cost. |
| Incoterm | The term and named place, plus who arranges freight, insurance and import clearance. | It fixes where cost and risk transfer. |
| Voltage and plug | Input range, voltage, frequency, and the plug or terminal supplied; confirm 220 V 60 Hz and any 110 V circuit. | The wrong adapter or plug stops commissioning. |
| Documentation | Invoice, packing list, transport document, certificate of origin, datasheet, test reports and conformity certificate. | Customs and the project owner need matching documents. |
| Certification and type approval | Approvals the offered model carries, and whether NTC type approval applies. The importer confirms the scope. | Unapproved equipment can be held at import. |
| Payment | Currency, method, milestones, bank charges, letter-of-credit acceptance and offer validity. | Terms change the cash cost and the risk on both sides. |
| Warranty and spares | Warranty period and coverage, RMA route, recommended spare list and firmware support. | Recovery depends on the spare in the store. |
Rates, duty, tax and terms are confirmed at quotation for the selected models and destination. The table is a checklist, not a tariff or price list.
Market FAQ
Philippines: questions before the order.
If your question is not here, send the site details and we will answer with the calculation, not a brochure.
Ask an engineerWhich OLT should a developer specify?
Start from the unit count and split plan. A 1-PON gateway suits a small building; an 8- or 16-PON OLT suits a subdivision or campus. Use 1:32 for long routes and 1:64 for short in-building ODNs.
Is 60 Hz a problem for the equipment?
Check that the OLT and switch supplies are rated for 50/60 Hz, and that the adapter and plug match the site. Confirm the input range and outlet type, and check older buildings for 110 V circuits.
How do we protect outdoor cameras from typhoons?
Use IP-rated, wind-rated enclosures and brackets, keep the fibre backbone optical, keep copper drops short, and fit surge protection at the cabinet and pole. Bond the enclosure to earth.
PoE or PoF for a gate camera?
PoE if a powered switch is within 100 m. PoF if the camera is under 12 W and within 200 m of a splitter, with no mains at the gate. A PTZ with a heater needs a local cabinet and a larger supply.
Can one fibre carry data and CATV?
Yes. A 1550 nm transmitter and EDFA overlay CATV on the same ODN with a WDM coupler; the ONT needs a 1550 nm CATV port and the budget must include the coupler loss.
What should the quotation show for customs?
The code per line, commonly 8517.62 for network equipment, with cable shown separately. Include the Incoterm, packing list, certificate of origin and any NTC approval documents the importer requires.
Next step
Planning a project in Philippines?
Send the destination port, the endpoint count, the longest run and the mains condition. We return the configuration, the document set and the quotation assumptions.
No obligation. The plan states its assumptions so your engineer can check it.