Market guide · Southeast Asia

PON and PoF supply for Vietnam

Vietnam combines fast estate and FTTH build-out with dense urban routes and a growing hotel and industrial base. The design conversation is about ONT choice, split ratio, and how to power endpoints where the building has no spare circuit.

Updated October 24, 2026

Region
Southeast Asia
Configuration
PON + PoE/PoF
Docs
Quote + HS
Design
Budget-first
Metro fibre routes entering a city network

Site conditions

What changes the design here.

These are planning conditions, not market statistics. They change the power path, the surge protection, the cabinet cooling and the spares plan.

Grid stability
Generally available in cities; outages and voltage swings still shape backup planning
Urban density
Narrow plots and shared poles make routing the main constraint
Heat and humidity
High year-round; use ventilated cabinets and corrosion-resistant hardware
Lightning
Thunderstorm exposure is a design factor; keep copper drops short
New urban areas
Estates and apartment towers are fitted out by developers and contractors
Hospitality growth
Hotels and serviced apartments need data, voice and TV on one fibre
Site power
220 V AC, 50 Hz typical; confirm the outlet type at each site

Planning data makes Vietnam the strongest search market in Southeast Asia for this category, and the project mix explains why: new urban areas, apartment buildings, hotels, industrial parks and CCTV upgrades. Developers, contractors and local ISPs often assemble the optical and power scope together.

The physical conditions are demanding. Narrow plots, shared poles and busy facades make cable routing the constraint, while heat, humidity and thunderstorm exposure punish any copper drop left long. Fibre to the building or floor, with a short copper tail, is easier to route and protect.

A practical quotation links the PON mode and split ratio to the ONT count, adds PoE switches only where a powered cabinet exists, and uses PoF for the camera, AP or reader that has no mains. Where the project sells TV, the 1550 nm CATV chain should be shown separately from the data PON.

Import note

HS classification, duty, VAT/GST and type approval are confirmed by the importer’s licensed broker and the destination regulator. The quotation states the Incoterm and the document set; it does not replace a customs ruling.

What buyers usually plan

Vietnam: the common project types.

01

FTTH and new urban areas

GPON OLT platforms run from a compact 1-PON gateway to an 8- or 16-port chassis, with 1:32 or 1:64 splitters and one ONT family. Using one or two ONT models keeps firmware, spares and subscriber support simple.

02

Apartment and MDU networks

A building riser is a short ODN, so 1:64 splitting is often practical. Wi-Fi 6 ONTs in the units, a PoE switch for corridor APs and VLAN separation for tenant, CCTV and building services cover most fit-outs.

03

CCTV and perimeter

A 24-port PoE switch covers a floor of cameras. Poles, gates and long perimeters need fibre to a local cabinet, with PoF for isolated cameras under 12 W and within 200 m.

04

Hotels and hospitality

One fibre to the room carries data and 1550 nm CATV. Specify an ONT with a CATV port, a transmitter and EDFA at the headend, and separate VLANs for guest, staff and payment traffic.

05

Industrial parks and factories

Industrial PoE switches with wide temperature range, DIN mounting and redundant DC are specified for plant floors and outdoor cabinets. A fibre ring between cabinets limits the impact of a single cable cut.

Starting configuration

01GPON OLT with multiple PON ports and SFP uplinks

PON access · OLT

GPON OLT

From a 1-PON gateway to a 112-PON headend.

GPON OLT platforms for FTTH, campus and hotel access: 2.5 Gbps downstream and 1.25 Gbps upstream, 1:64 split per PON port and 20 km reach on Class B+ optics. Configurations run from a compact 1-PON gateway with built-in AC to a chassis with up to 112 PON ports.

Line rate
2.5 Gbps ↓ / 1.25 Gbps ↑
Max split
1:64 per PON port
Reach
20 km, Class B+
PON ports
1 – 112

Best for FTTH Access Network · Campus Fibre Network · Outdoor Wireless Coverage

View specifications
02XPON ONT with four GE ports, Wi-Fi 6 antennas and USB

PON access · ONU / ONT

GPON / XPON ONU & ONT

From a 1-GE bridge to a 4-GE Wi-Fi 6 gateway.

XPON ONU and ONT options for FTTH, hotel rooms, offices and outdoor cabinets: 1, 2 or 4 GE ports, Wi-Fi 4/5/6, CATV and POTS options, and 10G PON models. All units are SC single-mode, 20 km, EPON/GPON dual-mode where the model supports it.

PON
XPON, EPON/GPON
User ports
1 – 4 × GE
Wi-Fi
Wi-Fi 4 / 5 / 6
Reach
20 km

Best for FTTH Access Network · Campus Fibre Network · Outdoor Wireless Coverage

View specifications
031U EPON OLT with eight PON ports and SFP uplinks

PON access · OLT

8-Port EPON OLT

1U, eight EPON ports, up to 512 ONUs.

A 1U EPON OLT with eight PON ports, 16 uplink ports and a 128 Gbps backplane. It supports 1:64 splitting, 20 km reach and up to 512 ONUs, making it a compact headend for CCTV, campus and small FTTH networks.

PON ports
8 × EPON
Line rate
1.25 Gbps symmetric
Max ONUs
512 (64 per port)
Backplane
128 Gbps

Best for CCTV & Surveillance Power · Campus Fibre Network · FTTH Access Network

View specifications
04Stack of managed PoE switches with RJ45 and SFP+ uplinks

PoE switching · managed & unmanaged

PoE Switches

8 to 48 PoE ports, with 10G and 100G uplinks.

PoE switch families from compact 4–8 port units to 48-port Layer 3 switches with 100G uplinks. IEEE 802.3af/at power, VLAN and IGMP isolation, and a 100 m copper limit that decides where the fibre has to take over.

Ports
4 – 48 × GE PoE
Uplinks
GE / 10G / 100G
Power
802.3af / at
Distance
100 m copper

Best for CCTV & Surveillance Power · Parking Lot Camera System · Perimeter Security Power

View specifications
05PoF power splitter with eight optical power outputs

Power over Fiber · access

PoF Switch & PoF ONU

One hybrid cable to the ceiling: data and 12 W.

A Power-over-Fiber access set: an optical gateway, an 8-output PoF power splitter, hybrid PoF cable and a ceiling Wi-Fi 6 ONU. Each output delivers up to 12 W to 200 m, so ceiling APs and cameras run without a local mains socket.

Power per port
Up to 12 W
Reach
Up to 200 m
Outputs
8 + 1 cascade
Wi-Fi
Wi-Fi 6 AX3000

Best for Outdoor Wireless Coverage · Campus Fibre Network · Parking Lot Camera System

View specifications
06Fiber distribution box with PLC splitters and SC adapters

PON access · ODN

Fiber Optic Splitter (PLC)

1×2 to 1×64, SC/UPC or SC/APC.

Planar lightwave circuit splitters from 1×2 to 1×64 for PON ODN construction. Typical insertion loss runs from 3.6 dB at 1×2 to 20.5 dB at 1×64; each batch ships with test data and the connector polish you specify.

Ratios
1×2 – 1×64
Wavelength
1260 – 1650 nm
Insertion loss
3.6 – 20.5 dB
Connector
SC/UPC / SC/APC

Best for FTTH Access Network · Campus Fibre Network · CCTV & Surveillance Power

View specifications

Procurement

What the quotation should state.

Use this as a checklist for any supplier, including us. A quote that omits these lines is not a project quote.

TopicWhat the quotation should stateWhy
HS codeCode per line; network equipment is commonly 8517.62, cable and accessories may differ. The broker confirms.A wrong code delays clearance and changes the landed cost.
IncotermThe term and named place, plus who arranges freight, insurance and import clearance.It fixes where cost and risk transfer.
Voltage and plugInput range, voltage, frequency, and the plug or terminal supplied; confirm the site outlet.The wrong adapter or plug stops commissioning.
DocumentationInvoice, packing list, transport document, certificate of origin, datasheet, test reports and conformity certificate.Customs and the project owner need matching documents.
Certification and type approvalApprovals the offered model carries, and whether Vietnamese telecom type approval applies. The importer confirms.Unapproved equipment can be held at import.
PaymentCurrency, method, milestones, bank charges, letter-of-credit acceptance and offer validity.Terms change the cash cost and the risk on both sides.
Warranty and sparesWarranty period and coverage, RMA route, recommended spare list and firmware support.Recovery depends on the spare in the store.

Rates, duty, tax and terms are confirmed at quotation for the selected models and destination. The table is a checklist, not a tariff or price list.

Market FAQ

Vietnam: questions before the order.

If your question is not here, send the site details and we will answer with the calculation, not a brochure.

Ask an engineer

Is GPON or EPON better for a Vietnam project?

Match the existing headend and ONT stock. GPON gives 2.5 Gbps down and 1.25 Gbps up; EPON gives symmetric 1.25 Gbps and is often lower cost for CCTV and private networks. Do not mix them on one PON port.

How many ONTs can one PON port serve?

Up to 64 at a 1:64 split, but plan for 50-70% fill, so 32-45 active ONTs. On long routes, 1:32 gives about 4 dB more margin and is the safer choice.

Can PoF power a street or gate camera?

Yes if the camera draws under 12 W and the run is under 200 m. A PTZ with a heater usually exceeds the port rating, so use a local PoE switch in a cabinet or bring mains to the pole.

How should lightning and surge be handled?

Keep the backbone optical, keep copper drops short, fit surge protection at cabinet and pole entries, and bond the enclosure to the local earth. Follow the site risk assessment and local code.

Does a hotel need a separate CATV network?

No. A 1550 nm transmitter and EDFA can overlay CATV on the same ODN with a WDM coupler, provided the ONT has a 1550 nm CATV port and the budget includes the coupler loss.

What should the quotation show for customs?

The HS code per line, commonly 8517.62 for network equipment, plus the Incoterm, origin documents and any conformity certificate. The licensed broker in Vietnam confirms the classification.

Next step

Planning a project in Vietnam?

Send the destination port, the endpoint count, the longest run and the mains condition. We return the configuration, the document set and the quotation assumptions.

No obligation. The plan states its assumptions so your engineer can check it.